the main towers arrived today about 3pm in 6 large wooden crates, which were quickly moved into my garage. i started removing the screws from the bottoms of the crates and my friend Andrew arrived to help. we lifted the tops off the crates, then moved the 6 sections one by one onto a carpet covered piano dolly and rolled them down the hill to my barn and into my room.



then we decided to place the bottom section of each tower in place first, install the spikes and Wave Kinetics 2NS footers and then level them.....thinking this would be easier/better than attaching them all together and tilting them up.....which would make the leveling more difficult. we had a third person coming to assist us and figured with three we could lift the top section on. wrong; we ended up needing a forth helper since the main towers are so tall; 84 inches. with 4 it was quickly done.





then we decided to place the bottom section of each tower in place first, install the spikes and Wave Kinetics 2NS footers and then level them.....thinking this would be easier/better than attaching them all together and tilting them up.....which would make the leveling more difficult. we had a third person coming to assist us and figured with three we could lift the top section on. wrong; we ended up needing a forth helper since the main towers are so tall; 84 inches. with 4 it was quickly done.

